Greetings,

As part of AIMS comprehensive upgrading regime to ensure that all systems are with high reliability and efficiency, AIMS Data Centre will be carrying out an upgrade on our UPS system.

The planned maintenance details as below:

Objectives: New UPS Power and Redundancy Upgrade

Planned Maintenance Purpose:

1. To replace existing UPS system and to enhance Level 1 data centre UPS system with high reliability and efficiency

2. To increase rack power density for future high power density demand.

3. To provide fully redundant UPS protection system on both PDU Power Sources (A & B).


Affected IP range:

203.223.152.X
203.223.135.X
116.0.120.X
116.0.121.X
203.223.149.X
202.76.232.X

Maintenance Time:  24th September 2016 - 2200 to 2359 GMT8+

Downtime: 30mins or less

We will power down all single power source equipment when we switching the newly provided commando socket. We will switch back the server once the switching is completed.

If you need any assistance during this time, kindly email to [email protected] for further assistance.

 

Regards,
ServerFreak Support Team